Generally, these types of charges are not allowable on grants and contracts. In the rare cases when these charges are allowable supporting documentation of each charge is required. The documentation must demonstrate how the cost was determined to be allocable to the award. For more information, see the “Shared Costs Tracking Documentation Guidelines’, Shared Costs Tracking Documentation Guidelines.pdf
Last updated: 12/21/2022